Solution:Total work=LCM(10,12,15)=60 unitSpeed of A=6010unit /days=6 unit/daysSpeed of B=6012unit /days=5 unit/daysSpeed of C=6015unit /days=4 unit/daysIf all work together, they will do (6+5+4) unit/day=15 unit/dayTotal time when they work together=6015=4 daysA will do 6×4=24 unit i.e., 2460=25 of workB will do 5×4=20 unit i.e., 2060=13 of workC will do 4×4=16unit i.e., 1660=415of work 