27 men can complete 1/6 of a job in 20 days. How many men can complete the job in 90 days

Dear Student,

27 men can complete 16 of a job in 20 days.27 men complete the full work in 20×6 = 120 daysLet the number of men required to complete the work in 90 days be x.Since the work to be done remains the same,The work done by 27 men in 120 days will be equal to work done by x men in 90 days.27×120 = x×90 x= 27×12090 = 36 menSo, 36 men can complete the job in 90 days.