Rahul's field
length = 400m
breadth = 200m
perimeter = 2 x (l+b)
= 2 x 400 + 200
= 2 x 600
=1200
Rama's field
side = 300m
perimeter = 4 x side
= 4 x 300
= 1200
their cost per meter square = Rs 150 per meter sq
= 1200m x 150
= Rs 180000 for both the fields